Installation Instructions
4
Scope of delivery
Logano G515 – 6 720 647 208 (2014/09)10
4 Scope of delivery
The Logano G515 can be delivered either as a pre-assembled block or in
loose sections.
▶ Check that the packaging is undamaged on delivery.
▶ Check that the delivery is complete.
4.1 Logano G515 – Delivery as a pre-assembled block
4.2 Logano G515 – Delivery in loose sections
5 Transporting the boiler
Use suitable equipment to transport the individual boiler sections
(delivery as loose sections) and other individual parts.
Maximum permissible supply
temperature
3)
°F
(°C)
248
(120)
Maximum permissible operating
pressure
PSI
(bar)
87
(6)
1) Weight with packaging approx. 6–8% higher.
2) The details relate to the upper and lower rated output range.
3) Safety limit (high limit safety cut-out). Maximum possible supply temperature = safety limit (STB) – 32 °F (–18 K).
Example: Safety limit (STB): = 212 °F (100 °C), max. possible supply temperature = 212–32 = 180 °F (100–18 = 82 °C).
Logano G515
Boiler capacity Unit 240 295 350 400 455 510
Table 4
Component Qty Packaging
Boiler block with burner door and draft
diverter
1 Pallet
Assembly components (longitudinal rails
and supply pipe)
1 Box
Jacket Pack A, B, C (according to boiler
rating)
1– 3 Cartons
Thermal insulation 1 PU bag
Table 5
Component Qty Packaging
Front and rear section as well as burner
door
1 Pallet
Intermediate sections – (depending on
boiler size)
1– 2 Pallet
Fittings 1 Box
Exhaust manifold 1 Box
Tie rods 1 bundle
Assembly components (longitudinal rails
and supply pipe)
1 Box
Jacket Pack A, B, C (according to boiler
rating)
1– 3 Cartons
Thermal insulation 1 PU bag
Table 6
WARNING: Risk of injury from improperly secured
boiler sections.
▶ Use only suitable means of transportation when
handling the boiler sections, e.g. a heavy duty hand
truck.
▶ Secure the individual boiler sections to prevent them
from sliding off during transport.
NOTICE: Risk of system damage from impacts.
▶ The standard delivery of the Logano G515 oil/gas-
fired boiler contains components that are sensitive
to shock.
▶ During handling protect all electronic and other
components against impact.
▶ Please observe the transport instructions on the
packaging.
NOTICE: Risk of system damage from contamination.
▶ If you intend to keep the boiler in storage once it has
been assembled, observe the following:
▶ Protect the boiler connections against
contamination by sealing them off or covering them.
Dispose of packaging in an environmentally responsible
manner.