Installation Instructions
13
System inspection and maintenance
Logano G315 – 6 720 817 939 (2016/04) 37
Additional maintenance work as-needed Page Date:____________ Date:____________
1. Shut down the heating system 33
2. Remove and clean flue gas baffles 34
3. Clean the flue gas passages (heating surfaces) 34
4. Clean the combustion chamber 34
5. Clean the draft diverter 34
6. Insert the flue gas baffles 35
7. Check gaskets/sealant ropes on the burner and burner door and
replace if required (see burner documentation)
8. Commissioning the heating system 31
9. Record the final checks of the maintenance work, incl.
measurements and test results
10. Check safe and proper operation
Confirm professional inspection
Company stamp/
signature
Company stamp/
signature
Table 15
Date:____________ Date:____________ Date:____________ Date:____________
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Table 16










