Installation Instructions
13
System inspection and maintenance
Logano G315 – 6 720 817 939 (2016/04)36
13.7 Inspection and maintenance reports
The inspection and maintenance logs provide an overview of the
required inspection and maintenance work.
▶ Initial and date the inspection operations completed.
The inspection and maintenance logs can also be used as templates.
Inspection work Page Date:____________ Date:____________
1. Check general condition of heating system
2. Visual inspection and function check of the heating system
3. Check fuel and water-carrying components of the system for:
• Leaks during operation
• Visible signs of corrosion
• Signs of aging
4. Check the combustion chamber and heating surfaces for
contamination. Shut down the heating system first.
33
5. Check the burner ( burner documentation)
6. Check the flue gas and venting system for proper operation and
safety ( burner documentation)
7. Check the operating pressure and inlet pressure of the diaphragm
expansion vessel for heating systems
35
8. Check the function of indirect-fired heater and ionization rod
( tank documentation)
9. Check the control panel setting ( control panel documentation)
10. Record the final checks of the inspection work,
incl. measurements and test results
Confirm professional inspection
Company stamp/
signature
Company stamp/
signature
Table 14 Inspection report
If during inspection work conditions are identified that
require maintenance, this work must be performed on an
as-required basis. If make-up water is added, the quality
of this water must correspond to the specifications in the
enclosed operating manual.










