Installation Instructions

4
Scope of delivery
Logano G315 – 6 720 817 939 (2016/04)10
4 Scope of delivery
The Logano G315 can be delivered either as a pre-assembled block or in
loose sections.
Check that the packaging is undamaged on delivery.
Check that the delivery is complete.
4.1 Logano G315 - delivery as a pre-assembled block
4.2 Logano G315 – delivery unassembled
5 Transporting the boiler
Use suitable equipment to transport the individual boiler sections
(delivery unassembled) and other individual parts.
Maximum permissible supply
temperature
3)
°F
( °C)
248
(120)
Maximum permissible operating
pressure
PSI
(bar)
87
(6)
1) Weight with packaging approx. 6 – 8 % higher.
2) The details relate to the upper and lower rated output range.
3) Safety limit (high limit safety cut-out). Maximum possible supply temperature = safety limit (STB) – 32 °F (–18 K).
Example: Safety limit (STB) = 212 °F (100 °C), max. possible supply temperature = 212 – 32 = 180 °F (100 – 18 = 82 °C).
Logano G315
Boiler capacity Unit 105 140 170 200 230
Table 4
Component Qty Packaging
Boiler block with burner door and supply
pipe
1 Pallet
Jacket pack (according to boiler rating) 1 Cartons
Thermal insulation 1 bag
Table 5
Component Qty Packaging
Front and rear section, 3 intermediate
sections as well as burner door
1 Pallet
Intermediate sections – (depending on
boiler size)
1 Pallet
Fittings and draft diverter 1 Box
Tie rods and supply pipe 1 Bundle
Jacket pack (according to boiler rating) 1 Cartons
Thermal insulation 1 Bag
Table 6
WARNING: Risk of injury from improperly secured
boiler sections.
Use only suitable means of transportation when
handling the boiler sections, e.g. a heavy duty hand
truck.
Secure the individual boiler sections to prevent them
from sliding off during transport.
NOTICE: Risk of system damage from impacts.
The standard delivery of the Logano G315 oil/gas-
fired boiler contains components that are sensitive
to shock.
During handling protect all electronic and other
components against impact.
Please observe the transport instructions on the
packaging.
NOTICE: Risk of system damage from contamination.
If you intend to keep the boiler in storage once it has
been assembled, observe the following:
Protect the boiler connections against
contamination by sealing them off or covering them.
Dispose of packaging in an environmentally responsible
manner.