Installation and Maintenance Manual Logalux LT135/2 – 300/2 • Issue 2013/08
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
8.5 Placing the Tank Back in Operation after Cleaning
z Install the clean-out cover together with magnesium
anode (Fig. 19, Item. 1) back in the tank. Observe
the orientation of the tank gasket. The word
"Deckelseite" must be facing the clean-out cover.
z Tighten hex head bolts (Fig. 19, Item. 4) by hand.
z Tighten the hex head bolts for the clean-out cover
witha¾ turn usingawrench(Fig. 19, Item. 4).
z Fill the tank and turn on the heating system.
z Check all connections and clean-out cover for leaks.
z Put back the insulation ring (Fig. 20, Item. 2).
z Put the front cover (Fig. 20, Item. 1) back and secure
with 4 screws.
Fig. 19 Installing a new anode rod
Item. 1: Magnesium anode
Item. 2: Clean-out cover gasket
Item. 3: Clean-out cover
Item. 4: Hex head bolt
Item. 5: Ground cable tap
3
2
4
1
5
CAUTION!
SYSTEM DAMAGE
Due to defective gasket.
z We recommend using a new gasket
(Fig. 19, Item. 2) when changing out
the Magnesium anode to avoid a
leakage at the tank.
CAUTION!
SYSTEM DAMAGE
Due to corrosion.
z Make sure to securely tighten the
ground cable (Fig. 19, Item 5) with a
wrench to the clean-out cover to ensure
a good electrical connection.
Fig. 20 Installing insulation and front cover
Item. 1: Front cover
Item. 2: Insulation Ring