Install Instructions
Table Of Contents
- Contents
- 1 Safety considerations
- 1.1 Key to symbols
- 1.2 Safety instructions
- 2 Product Description
- 3 Dimensions and Connections
- 4 Scope of delivery
- 5 Moving the boiler
- 6 Placing the boiler
- 7 Boiler installation
- 8 Check openings for combustion air supply and venting
- 9 Requirements for connection to chimneys or venting systems
- 10 Flue pipe installation
- 11 Placing the heating system in operation
- 12 Final start-up procedures
- 13 Start-up protocol
- 14 Taking the heating system out of operation
- 15 Boiler inspection and maintenance
- 15.1 Why is regular maintenance important?
- 15.2 Testing the flue system, including combustion air, air inlets and Ventilation openings
- 15.3 Inspection of the boiler and burner
- 15.4 Preparing boiler for cleaning
- 15.5 Cleaning the boiler
- 15.6 Cleaning the burner
- 15.7 Maintenance protocol
- 15.8 Troubleshooting the GC 144 II
- 16 Technical specifications
- 17 Electrical circuit diagrams
15
Boiler inspection and maintenance
Logano GC 144 II – 6 720 808 893 (2014/04) 25
15.7 Maintenance protocol
Please check off the maintenance work as it is completed and record the
measured values.
Follow the instructions on the following pages.
Maintenance work Page Date: Date:
1. Inspection of the flue system including combustion
air, inlet and outlet openings
page 20
2. Gas manifold pressure page 20
page 11
3. Inspection of burner page 20
4. Cleaning of boiler page 21
5. Cleaning of burner page 23
6. Measuring gas supply pressure page 16 –––––––inches W. C. –––––––inches W. C.
7. Measuring orifice pressure page 16 –––––––inches W. C. –––––––inches W. C.
8. Checking for leaks in operating condition page 14
9. Checking pilot burner flame page 21 ff.
10. Checking main burner flame page 16
11. Check the vent damper page 18
12. Check high temperature limit control page 18
13. Check the area around the boiler for flammable
materials, gasoline or corrosive liquids.
page 15
14. Confirm maintenance
Confirmation of correct maintenance
(company stamp, signature)
Table 12 Maintenance protocol