Conversion Instructions
Table Of Contents
5
Final start-up procedures
Logano GC 144 II – 6720808897 (2013/08) 9
▶ Carefully wipe away the soapy water to prevent corrosion caused by
the alkaline content of the soap.
Checking the vent damper
▶ Check the position of the vent damper. The damper must be fully
open (vertical). When burner is on flue gases must not escape from
the open draft hood.
Fig. 14 Checking vent damper
[1] Open draft hood
[2] Vent connection
[3] Vent damper
[4] Damper blade position indicator
[5] Vent damper motor
[6] Flue gas collector
[7] Boiler
Checking aquastat
Check the function of the maximum aquastat to make sure that it
switches the boiler off as soon as the boiler water temperature set at the
aquastat is reached. Record the result in the start-up protocol.
▶ Set aquastat to its desired setting.
▶ Replace front door and close.
Fig. 15 Checking temperature control
[1] Adjustment keypad
WARNING: Risk to life due to leaking flue gases.
▶ Verify the functionality and operability of the vent
damper.
4
3
2
1
5
6
7
6 720 804 435-14.1T
6 720 804 435-15.1T
1