Conversion Instructions

2
Product information
Logano GC 144 II – 6720808897 (2013/08) 3
2 Product information
2.1 Correct use
This conversion kit and the accompanying instructions are for
conversion of GC 144 II special gas-fired boilers from natural gas to
propane.
Requirements
2.2 Scope of delivery
Honeywell gas solenoid valve conversion kit
# 393 691, comprising:
black safety screw
pressure adjustment screw
–red spring
yellow label for gas valve
GC 144 II: BBR 12 pilot gas orifice
Main gas orifices and seals
"Conversion to propane" label (to be filled out and attached to the
unit)
•Technical documents
3 Conversion to propane
For your own safety read the instructions before conversion.
The following instructions must be followed for conversion of the
boiler to propane:
If the boiler was in operation, close the gas shut-off. Otherwise open
boiler front door.
Set room thermostat (optional) to the lowest value.
Disconnect the heating system from the power supply.
Open boiler front door.
Fig. 1 Opening boiler front door
Fig. 2 Gas valve
[1] ON/OFF knob (shown in ON position)
Turn gas valve ON/OFF knob clockwise to OFF position. Do not use
force.
GC 144 II–18
74 MBtu/hr
GC 144 II-25
103 MBtu/hr
GC 144 II-32
132.5 MBtu/hr
Table 2 Requirements
WARNING: Risk to life through not observing the
conversion instructions.
If you wish to convert the boiler for operation with
propane, the conversion from natural gas to propane
must be carried out first as specified by the attached
conversion instructions.
WARNING: Risk to life through fire or explosion.
Never use excessive force on the ON/OFF knob
( figure 2).
Turn ON/OFF knob only by hand.
Never use tools to turn knob.
If you are unable to turn the knob by hand, do not try
to repair it.
Call Buderus technical service for assistance.
6 720 804 435-01.1T
1
6 720 804 435-02.1T