User Guide

56
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers Issue 2014/10
We reserve the right to make any changes due to technical modifications.
Boiler maintenance11
On-demand maintenance procedures Page Date: ______ Date: ______ Date: ______
1. Shut down the heating system 49
2. Remove and clean the flue baffles 51
3. Clean the (heating surfaces) and combustion chamber, then re-
install the flue baffle plates in their original position.
51
4. Check and, if required, replace gaskets/sealing rope on the burner
door and burner
52
5. Start up the heating system 45
6. Carry out final check of the maintenance work
7. Check the function and safety in operation
Confirm professional maintenance
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Date: ______ Date: ______ Date: ______ Date: ______ Date: ______ Date: ______ Date: ______
1.
2.
3.
4.
5.
6.
7.
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature