User Guide

42
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers Issue 2014/10
We reserve the right to make any changes due to technical modifications.
Boiler installation8
z Slide temperature sensor bundle set with
compensating spring into the sensor well to the stop.
The plastic spiral is then pushed back automatically.
z Push the sensor holder (included with the control
device) over the side of the sensor well head.
Fig. 55 installing the temperature sensor set
1 Sensor well
2 Plastic spiral
3 Compensating spring
4 Sensor holder
1
2
3
4
NOTICE
If an AquaSmart
TM
or Hydrolevel
HydroStat is being installed the factory-
fitted immersion well must be replaced by
the immersion well supplied with the
control.
NOTICE
Ensure good contact between the sensor
surfaces and the sensor well to ensure
good temperature transfer. Use the
compensating spring.