User Guide

40
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers Issue 2014/10
We reserve the right to make any changes due to technical modifications.
Boiler installation8
8.7 HydroStat installation
The HydroStat controls the boiler supply temperature.
z For Installation and Operation of the HydroStat
Control and sensor well see the HydroStat
Installation Instructions supplied with the control. For
wiring diagrams of the HydroStat Î Chapter 12,
page 57.
8.8 Electrical connections
This section only applies to boilers using Buderus
Logamatic 2107 controls.
8.8.1 Fitting the Logamatic control panel
z Locate the push-in hooks of the Logamatic control
panel in the slots.
z Push the control panel towards the burner door.
z Let the flexible hooks of the control panel click into
the openings by pushing the control panel down.
WARNING!
DANGER TO LIFE
from electric shock.
z Only qualified electricians are permitted
to carry out electrical work.
z Before you open the control: shut off
electrical supply and secure against
accidental activation.
z Please observe all installation
instructions.
Fig. 52 Fitting the control panel
1 Flexible hooks
2 Locking tabs
3 Slots
4 Openings
1
4
2
3