Install Instructions

8
Heating system servicing
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
39
8.6 Servicing and maintenance logs
V Initial and date the servicing operations completed. The inspection and servicing logs can also be used as
copy masters.
Service work Page Date:______ Date:______ Date:______
1. Check general condition of heating system
2. Visual inspection and function check of the heating
system
3. Checking fuel and water-carrying components of the
system for:
leaks during operation
–leak test
visible signs of corrosion
signs of ageing
4. Check the combustion chamber and the heating sur-
face for contamination; shut down the system for this
step
34
5. Checking the burner (Æ burner documentation)
6. Check the combustion air supply and flue gas routing
for function and safety
7. Check the operating pressure, relief valve and expan-
sion tank inlet pressure
37
8. Checking function of DHW tank and sacrificial anode
(Æ DHW tank documentation)
9. Checking controls settings (Æ controls' documenta-
tion)
10. Record the final checks of the inspection work, incl.
measurements and test results
Confirmation of properly completed servicing Company
stamp/signa-
ture
Company
stamp/signa-
ture
Company
stamp/signa-
ture