GB142 Applications Manual
Programming - System 5
MCM10 multi cascade controller does not require any
programming.
Set boiler dial on BC10 to AUT on each boiler.
Set DHW dial on boiler to the OFF position if not in use.
Wiring detail
If using the AM10 follow the wiring and programming in
chapter 2.3. Connect a system supply sensor to pins 1/2.
If using a 0-10V signal from a BMS connect to pins 9/10.
Notice: Polarity sensitive: Ensure connection to the correct
poles: 9 = negative, 10 = positive
See Appendix 2 for details on this control option.
If using a dry contact closure for heat demand use pins 7/8.
If using the RC35 for outdoor reset control with room
influence (see Systems 1 and 2), connect to pins 11/12.
Connect the outdoor sensor to pins 3/4.
For additional information consult the MCM10 installation
manual.