User guide
Table Of Contents
- 1 About this manual
- 2 Safety
- 3 Technical data
- 4 Description of function
- 5 Putting into operation
- 6 Operation
- 6.1 Menu structure of the Vacuum Controller V-850/855 software
- 6.2 Vacuum Controller V-850/855 main screen in Manual mode
- 6.3 Selecting the distillation conditions
- 6.4 Starting a distillation
- 6.5 Vacuum Controller V-850/855 main screen in Gradient mode
- 6.6 General information on buttons
- 6.7 Main menu
- 6.8 Calibrating the pressure sensor
- 6.9 Recirculating chiller
- 6.10 Tips and tricks for a distillation
- 7 Maintenance
- 8 Troubleshooting
- 9 Shutdown, storage, transport and disposal
- 10 Spare parts
- 11 Declarations and requirements

5 Putting into operation
20 V-850/855 Operation Manual, Version E
5 Putting into operation
This chapter describes how the instrument is installed and gives instructions on initial startup.
NOTE:
Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedi-
ately to inform the postal company, railway company or transportation company.
Keep the original packaging for future transport.
5.1 Setting up the Rotavapor with the Vacuum Controller V-850/855
5.1.1 Installation
3
2
1
To install the vacuum controller to the Rotavapor,
proceed as follows:
• Screw the holder a for the vacuum controller
to the top of the Rotavapor.
• Slide the guide rail b of the vacuum controller
over the holder.
• Fix the vacuum controller to the holder by
tightening the knurled nut c.










