Instruction Manual

5 Putting into operation
31 B-290 Operation Manual, Version I
5.6 Installing the filters
Notice
Risk of instrument damage by internal overpressure.
External supply pressure must meet the system specifications
Exchange clogged or defective filters immediately
Dispose of clogged or defective filters immediately
5.6.1 Inlet filter installation
Use
Pre-filtering of environmental air to keep most impurities and particles away from the spray drying
process.
Fig. 5.5: Installing the inlet filter
To install the inlet filter directly connect it to the air inlet of the heater.
5.6.2 Outlet filter installation
Fig. 5.6: Installing the outlet filter
Screw the support angle to the bottom side of the panel.
Mount the filter directly.
Install the connecting tubing between cyclone and filter with an SVL 42.