Installation Guide
Table Of Contents
28
[S3] x 20
Securing the Roof Beam
[
S3] x 5
[S3] x 5
[
S3] x 5
[S3] x 5
DOOR
[
[
H1]
On each [SL]/[SR] there are five screw holes and
you need to nail [SL]/[SR] to the frame using
[S3].
COMMON MISTAKE: [H1] [H2]
Pay special attention to the layout of [H2] and
[H1]. If you are standing in front of the door,
[H2] is on your left. You need to check the stick-
er and make sure it is indeed [H2] that is on the
left.
H2]
[
Notice
20 [S3] are used in this step, seven for each [SL] or [SR]. The illustration above only shows the back side of the shed,
but the step for the front side is the same.
Notice that two [S3] are marked
①
for each [SL] or [SR], totaling eight. Lift the roofing support a little bit, and you will
find
①
marked [S3] are the only screws that have correspondent screw holes on the top frames. While nailing the
roofing support to the rest of the shed, make sure that you fix the eight marked [S3] first, and that the screws are
indeed going into the screw holes on the top frames.










