Installation Guide

15
[BL1] x 4 [BL2] x 2 [S3] x 8
Top Frames
[B1] x 1
[B2] x 1
[B4] x 1
[B5] x 1
[B4][B5]
[BL2]
[BL1]
[BL1]
A CB
[B4][B5]
[BL2]
A
B C
[BL1]
[BL1]
[B4]
[B5]
COMMON MISTAKE: Confusing Parts: Aluminum Frames [B1] [B2] [B3] [B4] and [B5]
Take a close look at these five frames. They are not the same and thus not interchangeable. They are not symmetrical either, so there is only one
correct layout. Here are some general rules:
1. Look for the [flat surface] first. There are screw holes on the [flat surface]. These screw holes are used for the connection between Con-
nectors([BL1] or [BL2]) and frames.
2. In Step 2.3 and 2.4, place the frames so that the [flat surface] points to the base of the shed, and the [opening] faces the inside of the
shed.
3. There are screw holes inside the [U channels] as well. They are used for the connection between panels and frames.
[Flat Surface]
[Opening] [Opening]
[Flat Surface]
[B4]
One end
[B4]
The other end
[U channel] [U Channel]
[U channel] [U channel]