User's Manual

Table Of Contents
MBSC2100E-005-RUCM11
Figure 33 RPM
2. Terminate the AC power supply wires that are required between the RPM and the local source of
AC power.
3. Tighten the coupling nut.
4.5 Installation Final Inspection
The following section provides a set of review procedures once the physical installation and connections are
complete. Leave the source AC power at the Host Unit and Remote Node in the OFF position (breaker open)
to prevent accidental power-up.
MBSC2100E-005-RUCM11 April 15, 2013
Page 37