User's Manual
mBSC DAS System
Installation Manual Issue 3
©2009‐2011,BTIPage47
Table 4-10. Host Unit Electrical Installation Check List
Items Description
1
Verify that the grounding cable is secure.
2
Confirm that the power cable connection is stable and is neither loose or damaged and
that the electrical polarity is correct.
3
Verify that the fiber optic cable is securely connected.
4
Check that all installed cables are securely connected.
5
Confirm that the alarm connectors are securely connected.