User's Manual
mBSC0800S-005-RUCM11
MBSC2100-005-RUCM11 April 15, 2013
Page 38
Figure 33 RPM
2. Terminate the AC power supply wires that are required between the RPM and the local source of
AC power.
3. Tighten the coupling nut.
4.5 Installation Final Inspection
The following section provides a set of review procedures once the physical installation and connections are
complete. Leave the source AC power at the Host Unit and Remote Node in the OFF position (breaker open)
to prevent accidental power-up.