User's Manual

MBSC0800-040-RU
MBSC0800-040-RU April 15, 2013
Page 38
Figure 35 AC Power Junction Box
2. Terminate the AC power supply wires that are required between the AC junction box and the local
source of AC power.
3. For each enclosure (CM-BTS and RU) connect the short AC power cable from the AC Junction Box
to the enclosure AC power port labeled “AC
4. Tighten the coupling nut.
Figure 364-Pin AC Power Connector
4.5 Installation Final Inspection
The following section provides a set of review procedures once the physical installation and connections are
complete. Leave the source AC power at the Host Unit and Remote Node in the OFF position (breaker open)
to prevent accidental power-up.