User's Manual

274
the pegs downward, one row at a time employing the same process. Upon reaching the lowest row of
holes in Zone C another cycle has been completed. The test is concluded when a total of twenty eight
cycles are completed. A ten second rest period is provided after the completion of each seven cycles
until the test is completed.
F.R.O.M. Standing Position – Occ
PROCESS
The test subject is instructed to move five rows of pegs from Panel 1 - Zone B to Panel 4 Zone B. The
transfer process requires the test subject to take the peg out of the hole with the left hand, transfer it to
the right hand while the peg is out of the hole, and then place the peg into the corresponding hole with the
right hand. The test subject commences with the highest level row and then proceeds in order to the
lowest level row. Once the fifteen pegs have been moved, the process is completed in reverse order until
all fifteen pegs are restored to their original position. This constitutes the completion of one cycle. The
test is concluded when a total of four cycles are completed.
F.R.O.M. Standing Position – Freq
PROCESS
The test subject is instructed to move five rows of pegs from Panel 1 - Zone B to Panel 4 - Zone B. The
transfer process requires the test subject to take the peg out of the hole with the left hand, transfer it to
the right hand while the peg is out of the hole, and then place the peg into the corresponding hole with the
right hand. The test subject commences with the highest level row and then proceeds in order to the
lowest level row. Once the fifteen pegs have been moved, the process is completed in reverse order until
all fifteen pegs are restored to their original position. This constitutes the completion of one cycle. The
test is concluded when a total of sixteen cycles are completed. The test subject is advised that a ten
second rest period is provided after the completion of each four cycles.