Instruction manual
1070 072 163-101 (97.11) GB
TS Programming System9-38
File Edit Options
Masks file
Variables file
Parameters file
Graphical objects
Project management
Simulation
Fig. 9-67 Project Management Menu, Download Menu Command
From the Main menu, pressing the [Alt-E] shortcut opens the Edit menu,
followed by selecting the Project management menu command, and
executing it by pressing [RETURN].
File Edit Options Terminal EPROM Version
Compile
Show errors
Download
Show map file
Show listing
Fig. 9-68 Download Procedure
In the menu that now opens, pressing the [Alt-E] shortcut opens the Edit
menu. The Download menu command is selected, and executed by
pressing [RETURN]. The [F6] key is now used to download the data of
the displayed project into the BT operator terminal.
File Edit
COM1 Interface
COM2 Interface
Fig. 9-69 Selecting Serial Interface
The interface can be changed by making the appropriate selection in the
Edit menu.
In the File menu, the Load program file menu command can be used to
send any project (that does not necessarily have to be loaded) to the con-
nected operator terminal. For this purpose, the names of the directory and
of the program file can be typed in directly, or selected by moving through
the displayed directory lists.
Prior to transferring the .S3 file to an operator terminal, the menu tree can
be simulated on the PC. To do so, the Edit menu is opened from the
Main menu level, the Simulation menu command is selected, followed
by pressing [RETURN] to start the simulation.