Operating instructions

12/23/2011 6 EI711A
Step 4
Add necessary baffling
a. See Step 2 for determination and if required
Step 5
Insert unit and bolt in place
a. Extend center V deflector to plenum depth
b. Do not drill into refrigerant lines
c. Note airflow decal
d. Seal as required
Step 6
Install WarmFlo sensors
a. Outdoor (OT) – extend to best location, mount with tip up
Attempt to shade from direct sun, north side is preferred
See electrical section with additional sensor details
b. Supply warm air (ST) – 16” to 20” above control box
Step 7
Be prepared to assist electrician with control wiring
a. Control wiring person must be familiar with Bryant or Carrier HP systems.
b. If utility load control is not used or required, verify jumper between BLU and BLU/WH remains.
Step 8
System checkout
a. Responsibility of the contractor who “sold the job”
b. Warranty sheet suggests minimal steps
c. Complete warranty sheet and send to Electro Industries