Service manual

CHAPTER 4 DISASSEMBLY AND RE-ASSEMBLY
4-48
(10) Remove the bearing L from the P/R shaft.
(11) Remove the P/R shaft from the frame.
Fig. 4-84
(12) Remove the idle gear 22.
(13) Remove the middle roller gear.
(14) Remove the bind B M3x10 taptite screw and the conductor bearing.
(15) Remove the 1st F/R shaft from the frame.
Fig. 4-85
Bearing L
P/R shaft
1st F/R shaft
Conductor bearing
Taptite bind B M3x10
Idle gear 22
Frame
Hook
1
2
Middle roller gear