Service manual

I-16
9.3 Parts Requiring Periodical Replacement
Following parts are replaced when a certain number of sheets are printed (life over) to
prevent troubles.
Fuser ASSY:
Equivalent to about 100,000 prints
Roll ASSY retard:
Equivalent to about 100,000 prints
Roll ASSY feed MSI :
Equivalent to about 45,000 prints *1
Roll ASSY retard MSI :
Equivalent to about 45,000 prints *1
Chute REGI ASSY:
Equivalent to about 300,000 prints
Roll ASSY feed:
Equivalent to about 300,000 prints
Turn roll bearing metal:
Equivalent to about 300,000 prints *2
Chute ASSY turn:
Equivalent to about 300,000 prints
*1 Replacement life when converting with utilization ratio CST 85% and MSI 15%.
*2 Bearing (ø6×L8)/metal is the same shape as turn roll bearing metal, but it is not
periodical replacement parts.
10. OPERATING ENVIRONMENT
10.1 Installation Temperature / Humidity
Installation temperature and humidity on the condition without condensation is as
follows.
At operating: 5-32 °C, 15-85%RH
At stopping: minus 20-40 °C, 5-85%RH
10.2 Installation Altitude
0 to 3,100m
10.3 Installation Horizontality
Within inclination of 5 degrees
10.4
Ambient Lighting
3000 Lux or less (without no direct sun beams)
11. SAFETY / ENVIRONMENT CONDITIONS
11.1 Safety Standard
100V / 120V system
UL1950 3rd Edition
CSA C22.2 No.950-M95
220V / 240V system
IEC60950 2nd Edition
11.2 Laser Safety Standard
100V / 120V system
FDA21CFR Chapter 1, Subchapter J, Section 1010, 1040
220V / 240V system
IEC60825 Class 1 Laser Product