Specifications

Hercules Boiler Model 12
OPERATION OF STOVE
READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THE STOVE
It is very important not to leave the stove running with
the doors open. This allows far too much air into the stove
causing the fire to burn excessively hot and will severely
damage the stove.
MAINTAINANCE REQUIREMENTS
The product you have purchased is a working appliance. It is important
that routine maintenance is carried out to ensure its longevity.
Rope seals on doors and glass should be checked on installation to ensure
a good seal. Place a strip of paper in the door and close it. If the paper can
be pulled out without tearing it the rope seal should be adjusted or may
need to be replaced. This test should be carried out every few months as
the rope seal will degrade with use. Replacement glass rope and high
temperature rope glue should be available from your local stockist. The
doors of the Hercules are mounted on adjustable hinge blocks. If these
have become misaligned during transportation or fitting they should be
adjusted so that they close securely. Routine clean out of the firebox,
removing grates and cleaning is equally important.
Controls Layout
Figure 2 – Control Layout
SecondaryAirControl
TertiaryAirControl
PrimaryAirControls