Technical data

Brocade VA-40FC Hardware Reference Manual 13
53-1001540-04
Product Name configuration
2
Product Name configuration
Once you have set up the Product Name in a rack or as a standalone switch, it is time to give it
power and a basic configuration. If you are going to use the Product Name in a single-switch setup,
you can use EZSwitchSetup to complete the basic configuration.
See the EZSwitchSetup CD, included with the Product Name for more information. You can also use
the Brocade VA-40FC Quickstart Guide.
If you do not want to use EZSwitchSetup, follow the instructions in the rest of this section.
Providing power to the switch
Perform the following steps to provide power to the Product Name.
1. Connect the power cords to both power supplies, and then to power sources on separate
circuits to protect against AC failure. Ensure that the cords have a minimum service loop of 6
in. available and are routed to avoid stress.
2. Power on the power supplies by flipping both AC switches to the “1” symbol. The power supply
LEDs display amber until POST is complete, and then change to green. The switch usually
requires from 1 to 3 min to boot and complete POST.
ATTENTION
Power is supplied to the switch as soon as the first power supply is connected and turned on.
3. After POST is complete, verify that the switch power and status LEDs on the left of the port side
of the switch are green.
Creating a serial connection
You will perform all basic configuration tasks in this guide using a serial connection.
Complete the following steps to create a serial connection to the switch.
1. Connect the serial cable to the serial port on the switch and to an RS-232 serial port on
the workstation.
If the serial port on the workstation is RJ-45 instead of RS-232, remove the adapter on the end
of the serial cable and insert the exposed RJ-45 connector into the RJ-45 serial port on
the workstation.