Operation verification
2
Operation verification
After you have installed any redundant power supplies, verify that the device is working properly by
plugging it into a power source and verifying that it passes its self test.
If your device has more than one power supply installed, repeat this procedure for each power
supply.
Verifying proper operation
1. Connect the power cord supplied with the device to the power connector on the power supply
on the rear of the device.
2. Insert the other end into a properly grounded electrical outlet.
3. Verify that the LED for each power supply is a solid green.
4. Verify proper operation by observing the LEDs.
All the port LEDs should flash momentarily, usually in sequence, while the device performs
diagnostics. After the diagnostics are complete, the LEDs will be dark except for the ones that
are attached by cables to other devices. If the links on these cables are good and the
connected device is powered on, the link LEDs will light.