Installation guide
Brocade NetIron CES 2000 and NetIron CER 2000 Hardware Installation Guide 21
53-1001834-01
Installation precautions
2
CAUTION
All fiber-optic interfaces use Class 1 lasers.
CAUTION
Do not install the device in an environment where the operating ambient temperature might
exceed 40
C (104
F).
CAUTION
Make sure the air flow around the front, sides, and back of the device is not restricted.
CAUTION
Never leave tools inside the chassis.
Lifting precautions
DANGER
Make sure the rack or cabinet housing the device is adequately secured to prevent it from
becoming unstable or falling over.
DANGER
Mount the devices you install in a rack or cabinet as low as possible. Place the heaviest device at
the bottom and progressively place lighter devices above.
Power precautions
CAUTION
Use a separate branch circuit for each AC power cord, which provides redundancy in case one of
the circuits fails.