Installation guide
Table Of Contents
- Contents
- Preface
- About This Document
- Product Overview
- Introduction
- Product overview
- Software features
- Upgrade applications
- Hardware features
- Brocade NetIron CES Series 2024C-4X
- Brocade NetIron CES Series 2024F-4X
- Brocade NetIron CES Series 2024C
- Brocade NetIron CES Series 2024F
- Brocade NetIron CES Series 2048C
- Brocade NetIron CES Series 2048CX
- Brocade NetIron CES Series 2048F
- Brocade NetIron CES Series 2048FX
- Brocade NetIron CER Series 2024C
- Brocade NetIron CER Series 2024F
- Brocade NetIron CER Series 2048C
- Brocade NetIron CER Series 2048CX
- Brocade NetIron CER Series 2048F
- Brocade NetIron CER Series 2048FX
- Control features
- Network interfaces
- Power supplies
- Cooling system and fans
- Connecting to a Network Device
- Installation
- Device Management Applications Familiarization
- Hardware Specifications
- Hardware Maintenance
- Hardware maintenance schedule
- Power supply replacement
- 10-Gigabit Ethernet module installation or replacement
- Replacing the fan tray
- Copper or Fiber optic module replacement
- Fiber optic connector cleaning
- Regulatory Statements
- Caution and Danger Notices
- Index

FIGURE 56 DC power supply screws
1 Chassis attachment screws 2 Assembly screws
9. Connect the wire to your DC power source, making sure to connect the -48V cable to the negative
terminal on the power supply and the 0V cable to the positive terminal as marked on the power
supply.
The equipment installation must meet NEC/CEC code requirements. Consult local authorities for
regulations.
NOTE
Ensure that the DC return is isolated from the chassis ground (DC-I) when connections to the power
supply are made.
CAUTION
For a DC system, use a grounding wire of at least 6 American Wire Gauge (AWG). The 6 AWG
wire should be attached to an agency-approved crimp connector crimped with the proper tool.
The crimp connector should allow for securement to both ground screws on the enclosure.
For the Ground lug, use UL listed Panduit crimp connector, P/N LCD6-10A, and two 10-32,
PPH, screws to secure crimp connector to chassis. Grounding position is located on the side
of the chassis adjacent ground symbol.
NOTE
To ensure adequate bonding when attaching the provided Panduit LCD6-10AF two-hole ground lug,
a minimum of 20 PSI of torque is required to be applied to the mounting hardware used to attach the
ground lug. Use a star washer to ensure an NEBS compliant connection.
Hardware Maintenance
Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide 91
53-1003263-02