Hardware manual

Version 1.1, 03/31/2015
GSS CCT Evaluation Technical Report Page 45 of 56 © 2015 Gossamer Security Solutions, Inc.
Document: AAR-BrocadeNetIron5.8 All rights reserved.
2.7.3.1 FTA_SSL_EXT.1.1
TSS Assurance Activities: None Defined
Guidance Assurance Activities: None Defined
Testing Assurance Activities: The evaluator shall perform the following test:
Test 1: The evaluator follows the operational guidance to configure several different values for the inactivity time
period referenced in the component. For each period configured, the evaluator establishes a local interactive
session with the TOE. The evaluator then observes that the session is either locked or terminated after the
configured time period. If locking was selected from the component, the evaluator then ensures that re-
authentication is needed when trying to unlock the session.
The evaluator set the console time period to 1 minute and observed a console timeout. The evaluator then set the
console timeout to 2 minutes and observed a console timeout. Note that when the session terminated, the screen
was left as-is and a new login prompt was presented.
2.7.4 DEFAULT TOE ACCESS BANNERS (FTA_TAB.1)
2.7.4.1 FTA_TAB.1.1
TSS Assurance Activities: The evaluator shall check the TSS to ensure that it details each method of access (local
and remote) available to the administrator (e.g., serial port, SSH, HTTPS).
Section 6.7 identifies that the administrator can access the TOE using any of the following methods: console, SSH,
or TLS/HTTPS interfaces.
Guidance Assurance Activities: None Defined
Testing Assurance Activities: The evaluator shall also perform the following test: