Installation guide
Brocade FastIron LS and FastIron LS-STK Hardware Installation Guide 11
53-1002187-01
Installation precautions
2
DRAFT: BROCADE CONFIDENTIAL
Installation precautions
Follow these precautions when installing a Brocade device.
General precautions
DANGER
All fiber optic interfaces use Class 1 lasers.
CAUTION
Do not install the device in an environment where the operating ambient temperature might
exceed 50
C (121
F).
CAUTION
Make sure the air flow around the front and sides of the device is not restricted.
CAUTION
Never leave tools inside the device.
11 Test IP connectivity to other devices by pinging them
and tracing routes.
“Testing connectivity” on page 46
12 Continue configuring the device using the CLI or the
Web management interface. You also can use
IronView to manage the device. Refer to the IronView
Network Manager User Guide for information.
FastIron Configuration Guide
13 Secure access to the device. FastIron Configuration Guide
TABLE 5 Installation tasks (Continued)
Task
number
Task Where to find more information