Technical data

BCSM IN A NUTSHELL 2008
© 2008 Brocade Communications Systems, Incorporated.
Page 35 of 44
ISL AND TRUNK MAINTENANCE
In order to have fabrics merge there must be some requirements met:
No duplicate domain IDs
fabric.ops parameters must be the same
In order to have a trunk group form, these requirements must be met:
Trunking licenses on both switches involved in the trunk
Trunks must start and end in a port group
Long distance settings must match
The maximum cable differential may not be greater than 400m
The port speeds must match, and cannot be lower than 2 Gbit/sec