Operating Instructions
Clicking the eBox into the eClick
Clicking the eBox into the eClick
01
Take the eBox and identify the
connecting points (here red) on
its rear side.
02
Connect the black ribbon data
cable of the eBox to port 4
(Expansion terminal) at the
bottom right of the eClick.
Before mounting the eBox, make sure the supply to the eClick is off.
1 LAN 1 RJ45 (eBox communication)
2a LAN 2 RJ45 (deactivated)
2b LAN 2 LSA plus (deactivated)
3 Cable clips for S/FTP cable
4 Expansion terminal (eBox communication)
5 LAN 1 LSA plus to internet router
90°
1
2a
5
3
4
2b
Clicking the eBox into the eClick
05
Keep a firm hold on the eBox
while pulling down the locking
bracket on the eClick. Now release
the locking clip. As soon as the
locking clip is pulled up, strongly
press the eBox onto the eClick.
06
If necessary, readjust the locking
bracket until it adopts its original
position. Alignment marks
(triangular recesses) are visible
on the locking clip of the eClick.
Check that the locking bracket
is fully inserted. The triangular
recesses to the left and right of
the locking bracket must be flush
with the eClick-housing.
07
Tighten the two grub screws
using the allen wrench at the rear
left and rear right of the eClick to
secure the locking mechanism in
place and the eBox on the eClick.
08
Power on the eClick circuit.
04
Place the eBox carefully on the
eClick, and push in the eBox to
the stop.
CAUTION
Ensure that the flat ribbon
data cables are not trapped
between the eClick and eBox
when mounting the eBox.
CAUTION
The grub screws should only be
fully inserted when the locking
clip is fully inserted.
03
If the eBox/eClick is to be
connected online via a router
using a LAN cable, place the white
ribbon data cable of the eBox on
port 1 on the left of the eClick.