Instruction Manual
© BriskHeat
®
Corporation. All rights reserved.
6
LYNX
TM
System Instructions
Connect Lynx Modules to docking stations, ensure clips are fully
engaged on both sides.
STEP 1: INSTALL HEATERS
Install the heaters onto the parts to be heated. Ensure that the heat-
ers make good contact across their entire area.
If not included in the heater, attach a temperature sensor to the part
as recommended by the heater manufacturer.
If using stand-alone Lynx docking station assembly, ensure heater
plug matches receptacle. Wire appropriate plug on heater if re-
quired.
STEP 2: ATTACH LYNX MODULES AND CABLES
Connect any additional Lynx docking stations to each other.
For stand-alone Lynx docking stations:
Connect RTD/Thermocouple sensors to the sensor port and
connect heater power plug to heater receptacle.
Ensure that all docking stations are secured properly to the heaters
or in such a way that the harness is not hanging freely. All modules
features a removable clip on the bottom that can be secured to a
variety of surfaces.
Connect a power harness to the first heater in each string and to
electrical power. All modules will start in Disabled Mode and will
therefore not heat until the control mode is changed by the operator.
LYNX SYSTEM SETUP GUIDE
STEP 1: INSTALL HEATERS