K-Series Heating Cable Installation Instructions
Note: Test should use at least a 500 VDC megger. Do not use a megger with an excess of 2500 VDC.
Minimum acceptable readings should be 20 megohms per circuit, regardless of length.
FOR HEATING CABLES WITH BRAID
Test from heating cable bus wires to braid.
A record should be kept of the readings taken from the time the cable is first installed on the pipe. A
history of the insulation resistance reading can be helpful in spotting moisture ingress into the electrical
system (indicated by a gradual decline in the insulation resistance) or physical damage to the heating
cable (indicated by a sharp decline in the insulation resistance). A sample record for this is shown. (See
the following page)
ELECTRICAL INSULATION RESISTANCE TEST
Electrical tests are recommended at specific points in the receipt and installation of the heating cable.
This periodical testing is designed to prevent the expenditure of wasted labor in the event of damage to
the product. Installation costs of the cable and thermal insulation are much greater that the heating
cable. Quick identification of any heating cable damage is the most economic approach to an installa-
tion. An insulation resistance test is recommended at the following point of the installation process:

UPON RECEIPT of the heating cable
 BEFORE thermal INSULATION installation
 IMMEDIATELY AFTER thermal insulation installation
 As part of a PERIODIC MAINTENANCE program
Procedure
The insulation resistance test is used to check for damage to extruded jackets. Connections for the
megger are made as shown.
500 VDC
MEGGER
500 VDC
MEGGER
PERIODIC INSPECTION RECORD
The Periodic Inspection record Form may be used in one of two ways:
1.One sheet per circuit - The results of periodic tests of a single circuit are posted in vertical columns, beginning on
the left and working toward the right. This allows easy comparison of test values for up to three test sequences on an
individual circuit.
2.One circuit per column - Test data for a single test sequence on as many as three circuits can be recorded on a
single sheet.
For additional Periodic Inspection Record Forms, contact your local distributor/representative or Briskheat at 1-800-848
-7673 (toll free, U.S. / Canada) or 1-674-294-3376 (Worldwide) or bhtsales1@briskheat.com.
FOR HEATING CABLES WITH BRAID AND OUTER
JACKET
Test A - (solid lines) from heating cable bus wires to
braid.
Test B - (dotted lines) from braid to metal pipe.
© BriskHeat Corporation. All rights reserved.
12
K-Series Heating Cable Installation Instructions
Circuit Number
Heater Type
Circuit Length
Freeze Protection Circuits -
Perform these checks as season requiring use ap-
Temperature Maintenance Circuits -
Perform these checks at least twice per year.
Maintenance Checks for _____________ Month _____________Year_________________
Visual inspection inside connection box Initial
corrosion, moisture, etc. Date
Damage or cracks (leaks) in insulation Initial
seals at valves, hangers, pumps, etc. Date
Heating cable properly connected and Initial
grounded. heating cable and connections
insulated from connection box. Date
Thermostat checked for moisture, corrosion, Set Point
set point, switch operation, and capillary Initial
damage Date
Megger tests performed at power Reading
connection with both bus wires disconnected Initial
from power wiring. Date
Circuit voltage at power connection. Reading
Circuit amperage after 5 minutes Reading
Pipe temperature at time amps were measured. Reading
Watts/Ft.
Volts x Amps = w/ft.
Initial
feet Date
All connections, boxes, and thermostats Initial
have been resealed. Date
End seals, covered splices and tees marked
Initial
On insulation cladding. Date
Remarks & Comments
Periodic Inspection Record Form