Full Product Manual
10 1019097-D
English Manual
NOTE: The Square Bearings must be completely inserted into the end panels.
1) toward the center until there is no free play along the
shaft. Tighten the six nuts (A) securing these panels fully.
1. WEARING GLOVES:
Slide the 10 Tines (5)
and 20 Bearings (6) onto the
Tine Shaft (2) as illustrated.
NOTE: Round projections on Bearings (6) must
fit into holes in Tines (5) and into two holes of
opposite Bearing.
Bearing (17) into the
Washer (15) on the
Tine Shaft (2) and slide
the shaft through the
end panel.
Step 4-B
ASSEMBLY
CAUTION: GlOves Are reqUIred.
Tines have extremely sharp points. Use caution when working around them.
5
2
6
6
A
A