Full Product Manual

10 1019097-D
English Manual
NOTE: The Square Bearings must be completely inserted into the end panels.
 1) toward the center until there is no free play along the
shaft. Tighten the six nuts (A) securing these panels fully.
1. WEARING GLOVES:
Slide the 10 Tines (5)
and 20 Bearings (6) onto the
Tine Shaft (2) as illustrated.
NOTE: Round projections on Bearings (6) must
fit into holes in Tines (5) and into two holes of
opposite Bearing.
 
Bearing (17) into the


Washer (15) on the
Tine Shaft (2) and slide
the shaft through the
end panel.
Step 4-B
ASSEMBLY
CAUTION: GlOves Are reqUIred.
Tines have extremely sharp points. Use caution when working around them.
5
2
6
6
A
A