User's Manual

- 3 -
Brillian Network & Automation Integrated System Co., Ltd.
1. When power is supplied, non-professional
personnel should not operate it to avoid electric
shock hazard.
2. Before checking, maintenance and repair,
please turn off the power.
3 Description of starting steps
3.1 Turn on breaker power.
3.2 Facility department is suggested to be AC 100~230V
4 Description of stopping steps
4.1 Please use externally connected screen or remote control program to confirm all the ports Purge
program are all in idle states.
4.2 After log in into the program, please select Quit to end the program.
4.3 Turn off breaker power.
4.4 Install lock for breaker and lock it.
4.5 Close the gas source switch at the facility end.