Installation Guide
We at Bridgewell Resources appreciate your business and to help
ensure you enjoy our ooring products for years to come please
read this installaon guide for your unnished ooring.
Step 1 – Prepare the Boards with Vapor-Barrier Paper
• Find your room’s square footage by mulplying the width by the
length, but also allow for an extra 10 to 15 percent for mistakes and
uneven boards.
• Leave the boards in the room for 48 hours to adjust to the room’s
humidity and temperature to avoid warping and gapping.
• Then staple vapor-barrier paper to the sub-oor leaving at least a
4-inch overlap of the vapor-barrier.
• Lay the boards perpendicular to the oor joists to create a solid
anchor.
• Face-nail the rst row to the oor joists.
Step 2 – Allowing for Expansion
• It’s important to allow for expansion. Leave a 3/8-inch gap along the
walls and secure the boards with a pneumac nail gun.
Step 3 – Avoid Awkward Alignment
• Put nails into the tongue every 10-12 inches.
• Then tap the groove to ensure a snug t.
• To avoid awkward aligning at the end joints, stagger boards at least 6
inches.
Quesons about our Bridgewell Resources products?
Call us at 800.264.3476 or email us at info@bridgewellresources.com
Unnished Hardwood Flooring
Installaon Guide