Datasheet

AR/GE/FE/U80/80XInstallationManual
3 58000519rev.D
2 SitePlanning
2.1 General
Beforethestartofanyinstallation,asurveyoftheplanneddeploymentsit eshouldbeconducted
first.Thesurveyingpersonnelshouldbefullyfamiliarwiththedetailsandrequirementsneededto
successfullyinstallthe80GHzradiosystem.
2.2 EquipmentChecklist
Wesuggestthesitesurveyteammayneedthefollowingequipment:
· Binoculars (notalwaysrequired)
· WAAScapableGPSlo cationdevice
· Tapemeasureto determinedistancesforcablerunstoingresspoints
· Digitalcamera(notalwaysrequired)
· Sitesurveyreportformtodocumentandhelpassesssite
· Signalingmirror(providedbutnotalwaysrequired)
· 7090GHzLinkRegistrationDatasheet.Co ntactBridgeWaveTechSupporttolearnw here
onecanobtaint helatestversionofthisform.YoumayEmail support@bridgewave.comfo r
thisrequestorrequestitonlineviaeServiceCenterhttp://bridgewave.com/support.
2.3 LineofSight(LOS)
The80GHzWirelessGigabitEthernetlinkrequiresLOSfor properoperation.Binocularsand
spottingmirrorsmaybeusedtoassistintheconfirmationofLOS.
PathplanningshouldincludeaninvestigationintofuturebuildingplansthatcouldblocktheLOS
path,andotherlongtermincrementalobstructionssuchastreegrowth.Intermittento bstructions
suchasaircra ftatanearbyairportshouldalso beconsidered.