Datasheet
AR/GE/FE/U80/80XInstallationManual
10 58000519rev.D
Theradioissealedatthefactorywarrantystickersontheinner
(metal)coveroftheradio.Thereisnoneedtoopenthiscoverin
thefield.Tamperingwith thesesealswillvoidthewarranty.
3.4 InstallationTools
Thefollowingtools,notprovidedbyBridgeWave,arerequiredforinstallingtheradioandthe
antenna:
· Screwdriver,slotted0.1inchwide.
· Openendwrench9/16inch 2ea.
· Openendwrench1/2inch.
· Ratchetwit h6inchextensionand9/16inchdeepsocket.
· Wirestripper/cutter/crimptool(1016gauge).
· Electricaltape.
· Fishtapeforpullingcable.
· Cabletiewraps.
· HandheldDVM(dig italvoltmeter)wit hstandardbananaplugreceptacles.
3.5 AntennaMountInstallation
1.Readtheseinstructionsbeforebeginninginstallation.Caution
shouldbeused.Qualifiedpersonsexperiencedwithantenna
assemblyandinstallationarerequiredforinstallation.
2. BridgeWaveCommunicationsInc.disclaimsanyresponsibility
orliabilityf or damageorinjuryresultingfromincorrectorunsafe
installationpractices.
3.Theantennahasbeenformedtoa veryclosetolerance
parabolicshape.Carefulhandlingandassemblyisrequiredto
avoiddentingthereflector,whichwoulddegradeantenna
performance.
Whenusingtheleftsideradiomountposition,theantennaendsup
gettingrotatedby180degrees.Thedrainholemustbeopenat
thebottomandclosedoffatthetopoftheantennatoprevent
wateringress.
· Forthe80X,movethebottomdrainholeplugtothetop
drainholeposition.
· FortheStandard80removethefourPhilipsheadscrews