Installation Instructions
TOOLS NEEDED
FLOORPOPS INSTALLING INSTRUCTIONS
TAPE MEASURE
CARPENTER
SQUARE
CLEANING TILES
Lay tile package flat.
Allow 48 hours to
acclimate to room
temperature of at
least 65°F (18°C).
48
hrs
65
°
Be sure surface
is clean, smooth,
flat & dry before
applying. Area
must be free of
grease, dirt, wax,
and other oils &
materials.
IF INSTALLING
OVER CONCRETE
A primer adhesive, such as liquid neoprene,
is necessary for a secure application.
Do not apply to loose
or uneven flooring.
Do not apply over
radiant heated floors.
5
DAYS
Do not clean with
soap, or an excessive
amount of water.
Allow 5 days to clean
tiles after application.
Use a vinyl floor cleaner.
Sweep, mop, vacuum
and/or dust as desired.
DO NOTDO
1. Mark perpendicular guidelines to find the center of the room.
*Using a chalk line is a preferred tool for this step.
2. Leaving the back liner on, lay tiles out from the center of the room, to the walls, ensuring each arrow on the back of the
tiles are pointed in the same direction. After laying out tiles, assess the ones on the outer edges and decide if you need
to shift all tiles over to avoid abnormally thin tile pieces when trimmed.
3. Starting from the center of the room, remove backing from your first tile and press firmly into place. Avoid touching
adhesive - dust, dirt and oils will aect its strength.
Install next tile tightly against the side of the first tile. Working on one quarter of the room at a time, apply tiles in a
step pattern.
4. If necessary, use a straight edge and utility knife to trim tiles to fit, when you reach the edge of your walls.
INSTALLATION
BEFORE INSTALLATION
1
2
4711
12 8
13
5
9
3
6
10
14
15
1 2 3 4
back of tilescenter of room trim as neededstep pattern
UTILITY KNIFE