Installation Guide

13
BREWER INSTALLATION
6. After sheet rock screwsareinplace,bendtabstonishsecuring
rough-in box to wall. See figures 6 and 7.Usepliers(ifneeded)
to bend/crimp tabsrmlytowall.Gentlyslideexcesswater
line back through grommet into wall cavity leaving top of
connectoramaximumof3”abovebottomofrough-inbox.
Carefully install power panel cover. All electrical wires and
connections MUST be tucked completely inside
POWER PANEL COVER, without exposing bare wiring inside
rough-in box. It is advised you contact a qualified electrician.
Be certain not to damage wires or insulation. See Figure 7
Installation of Brewer
7. Important,fortheBE-104Cmodel(singlebutton),set2/4cupvolume
selection switch on back of brewer prior to installation of brewer.
3" max
Power Panel
Figure 6
Figure 7