Installation & Assembly

Step 6
Step 7
Insert Hanging Part() into the top of Upper Pole(F).
Then insert the Spring() into the Hanging Part ().
Move the Rubber Ring(11) down the Lower Pole(E) until it is flush with the top of the
Base(A).
Upper Pole (F)
Hanging Part ()
Spring
( )
Lower Pole (E)
Base (A)
Base (A)
Rubber Ring (11)
Noble House Home Furnishings LLC Page 7 OF 10