Specifications

Installation TDB3104, WF3204
Bradley • 215-1479 Rev. J; EN 12-00-004 1/10/2013 9
5
Sprayhead, Actuator Module, and
Thermostatic Mixing Valve Installation
A
Install hemmed end (not sharp end) of support
tube with gasket onto bowl.
B
Place sprayhead with 3/8" tubing onto support
tube. Run the tubing down through the support
tube. Make sure the spray holes point away from
the wall.
C
Place the upper tie bar (notched at both corners
of each end) on top of sprayhead parallel to wall.
Connect the two threaded tie rods together using
the coupling nut with hex head set screws. Run
the tie rod down through upper tie bar and secure
from underneath the bowl using the lower tie bar
(no notches) and hex nut with socket head set
screw. A minimum of 2-1/4" of threaded tie rod
should protrude below the lower tie bar; this will
be required to attach the valving.
Tie Rod Pre-Pack
Cover
Actuator
Module
Assembly
Coupling
Nut and Set
Screw
Sprayhead
Tie Bar
Tie Rod
Supply Tube
Section View of
A/O Unit Assembly
Tie Rod Pre-Pack
(S45-1336)
Top Cover
(107-099 (A)
(107-179 (O)
Module Cover
(S04-083)
Sprayhead
(S05-054B)
Drain
(269-1597)
Terreon Semi-Circular Deep
Bowl (ADA Bowl Shown,
Classic Bowl is Optional)
(Part No. Varies with color
of bowl. Contact your local
Bradley Rep for assistance)
Access Panel
(186-1260)
Pedestal Assembly (S17-287)
Support
Tube Gasket
(125-011)
Support Tube
(S57-006)
Tie Rod
(176-008A)
Tie Bar
Actuator Module
Assembly (S65-134)
D
Place the actuator module assembly on top of
sprayhead. Rotate until actuator locks in with tie
bar. Drop the 1/8" diameter supply tube down to
pedestal.
Skip to step F for units without soap.
E
For units with soap option, install the spacer, soap
dispenser and cover using the couping nut, third
tie rod (8-5/8" long) and second coupling nut.
F
Secure actuator module cover and top cover with
acorn nut and socket head set screw.
G
Holding the valve assembly outside of pedestal,
connect 3/8" supply tubing and the 1/8" air
tubing from sprayhead to valve assembly tube
connectors. Also connect the two flexible hoses to
the valve assembly.
H
Thread one supplied 3/8" nut onto the tie rod. Slide
valve assembly on next and secure with another
3/8" nut. Connect flexible hoses to supply stops.
Make sure the hot supply is connected to the hot
inlet on the valve (marked with the letter "H") and
the cold supply is connected to the cold inlet on the
valve (marked with the letter "C").
I
Turn supplies on. Open stop valves completely.
Open volume control valve completely and check
piping installation for leaks. Push operating
pushbutton until air is purged from the lines.
Valve
Assembly
A/O Units
(A Shown)