Specifications

Installation TDB3104, WF3204
Bradley • 215-1470 Rev. J; ECN 12-00-004 1/10/2013 13
5b
Air Metering Valve Assembly for B Drain and H Drain Units with
Tie Pipe Option continued...
D
Place the actuator module assembly on top of the
sprayhead. Rotate until actuator module locks in
with tie bar. Drop 1/8" diameter tube down to the
valve assembly and connect to the air valve. Make
sure air valve push button is facing away from wall.
Skip to step F for units without soap.
E
For units with soap option, slide the spacer and
soap dispenser over the 1-1/2" pipe.
F
Position the upper tie bar slightly below the module
or soap dispenser and fasten securely to vent pipe
with set screws provided. Secure top cover to tie
bar with two cap screws provided.
G
Connect supply stops onto stub-outs. Connect
flexible hoses to supply stops.
UNIT WITH “H” DRAIN AND ACTUATOR
MODULE SHOWN, ALSO AVAILABLE
WITH “B” DRAIN
Top
Cover
Soap
Dispenser
Spacer
Module
Cover
Actuator
Module
Assembly
(S65-134)
Tie Bar
Sprayhead
(S05-054B)
Support Tube
Standard (S57-005)
TAS/Juv (S57-006)
Valve Assembly
(S45-2545)
3/8" Tube to
Sprayhead
Volume
Control Valve
Do not apply pipe sealant to
compression fittings.
Flexible
Hose
Stop
Stop
Thermostatic Mixing
Valve Assembly
Air Valve
Assembly
1/8" Tubing to
Actuator
Air Valve
Timer