Installation Guide

3
Installation S19-125BF, S19-125FMBF
Bradley • 215-1567 Rev. D; ECN 16-05-039 8/8/2016
Supplies Required
Teflon tape and Pipe sealant
Piping to 1” NPT water supply inlet on unit
Adequate supply pipe supports
Hardware to mount escutcheon to ceiling
Minimum 4” (102 mm) drain to accommodate 30 gallons per minute discharge for drench shower waste
Sign-mounting hardware
Assembly of Components and Parts List
w
ww.bradleycorp.com
PUSH
TO
ACTIVATE
SHOWER
S24-189
(S19-125BF only)
S24-197
(S19-125FMBF only)
113-864
(S19-125BF only)
204-421
www.bradleycorp.com
114-090
114-090
Service Prepacks
Valve Mounting Hardware Prepack
(includes Valve Mounting Bracket,
U-Bolt, Nuts and Washers)
S45-2236
Valve/Handle Prepack
(includes Handle and Valve Assembly)
S45-2237
Screw Prepack
(includes six screws and
Torx Power Bit)
S45-2235
150-212
(S19-125BF only)
Signed
Signed
Signed
Date
Date
Date
Signed
Unterschrift
Signe
Date
Datum
Date
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
169-1076
(S19-125BF only)