Installation Guide
3
Installation S19-120G
Bradley • 215-148CO Rev. S; ECM 12-05-016E 8/9/2012
15¾"
(400mm)
4"
(102mm)
Ø 3.1"
(78.7mm)
24"
(610mm)
84"
(2134mm)
Suggested
Height to
Floor
36"
(914mm)
to Floor
4½"
(114mm)
Installation
Supplies Required:
• (3) 3⁄8” floor anchors and bolts
• Tefon tape and pipe sealant
• Piping to 1¼” NPT water supply inlet
and to 1¼” NPT drain outlet on unit
• Adequate supply pipe supports
• Min. 4” drain to accommodate 30
gallons per minute discharge for shower
waste
• OPTIONAL: sign-mounting hardware
Step 1: Assemble components
1. Assemble the components as shown
on page 4.
• Apply pipe sealant to all male-
threaded pipe joints.
• Bottom edge of showerhead should
be 84” (2134 mm) from the floor.
Step 2: Connect water supply
Do not rely on Bradley’s Drench Shower
to support supply piping.
2. Connect water supply piping to 1”
NPT inlet on unit (piping supplied by
installer). Provide adequate supports
(supplied by installer) for supply pipe
using pipe hangers or other means.
3. Hang the safety sign from the unit with
the curtain hooks provided (or mount
it to the wall using sign-mounting
hardware by installer).
4. Open water supply lines. Test for leaks
and adequate water flow.