Installation Guide
4
S19-120FMBF Installation
7/18/2017 Bradley • 215-1261 Rev. G; ECN 17-05-039
Assembly of Components
Parts List
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
6.1
3
7
8
6.2
6.4
6
6.5
2
5
4
Align handle
pieces as
shown.
(2) ceiling
fasteners
(by installer)
1.5
1.4
1.3
1.2
1.21
1
NOTE: Items 1.1–1.5 come preassembled as Item 1.
1" NPT
Supply Inlet
NOTE: Use
teflon tape
only.
Item Part No. Qty. Description
1 S30-059 1 1" Stay-Open Ball Valve
Assembly
1.2 S27-278 1 1" Ball Valve with Nut
1.21 110-214 1 Jam Nut Only
1.3 153-489 1 Stop Bracket
1.4 124-048 1 Washer
1.5 128-201 1 Handle
2 113-006MT 1 Pipe 1" NPT x 21"
3 169-847 1 90° Elbow 1" NPT
4 S90-365C 1 Pull Rod, 48"
4.1 161-026 1 Hex Nut 1/4"-20 SS
5 107-329 1 Cover Plate
Item Part No. Qty. Description
6 S24-197 1 Flush-Mount Showerhead
Assembly
6.1 154-147 1 Ring
6.2 140-971 1 Bracket
6.4 269-1964 1 Showerhead Shell
6.5 S24-188 1 Plastic Showerhead Assembly
7 114-050 1 Safety Sign
8 204-421 1 Emergency Inspection Tag
18 128-150 1 Handle
19 142-002DC 3 Lockwasher
20 128-156G 1 Pull Rod, 26"